ARL 5.21% 50.5¢ ardea resources limited

Hi Rod and all ARL shareholders. As we all know, the main...

  1. 5,851 Posts.
    lightbulb Created with Sketch. 711
    Hi Rod and all ARL shareholders.

    As we all know, the main project for our company is not nickel sulphide, however, because Ardea has a host of offerings at its "one stop shop" (many of these offerings seem so completely overlooked at this stage) including Scandium and a host of Rare Earths / Critical Minerals. It goes without saying that the nickel sulphides at Emu Lake could be a huge company booster in several ways.

    Ardea has several times compared its Emu Lake to Silver Swan.This ARL project is located 35km east of the Black Swan Nickel Project, owned by Poseidon Nickel Ltd, within a comparable and parallel komatiite volcanic belt.

    In the recent quarterly Ardea reported as follows:

    With nickel sulphide deposits commonly occurring in clusters, Ardea is confident of defining a significant nickel sulphide camp, within the Company’s Kalpini tenure.

    In “Silver Swan style” nickel sulphide systems (as Emu Lake clearly is), the exploration methodology is to define a komatiite volcanic flow channel system, then determine whether the system is fertile for nickel sulphides. The geochemical assay results from AELD0003 confirm an exceptionally fertile system, entirely comparable to that documented for Silver Swan.

    The point of this post is to suggest that some of you here might like to google "Silver Swan Mine" to see the grades- potential- etc, ------- some interesting reading.
 
watchlist Created with Sketch. Add ARL (ASX) to my watchlist
(20min delay)
Last
50.5¢
Change
0.025(5.21%)
Mkt cap ! $100.8M
Open High Low Value Volume
49.0¢ 52.0¢ 48.5¢ $19.80K 39.06K

Buyers (Bids)

No. Vol. Price($)
1 2464 50.5¢
 

Sellers (Offers)

Price($) Vol. No.
52.0¢ 10000 1
View Market Depth
Last trade - 15.59pm 28/06/2024 (20 minute delay) ?
ARL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.