"The key elements of this update include:
• The successful startup of the second Ion Exchange (IX) Circuit at the Alta Mesa Central Processing
Plant.
• The Processing Plant is running at about 75% of total flow rate designed capacity with the current
constraints due to wellfield development.
• enCore is focused on accelerating wellfield development through securing additional drill rig
capacity to ensure that wellfield flow rates can be better matched to plant capacity.
• enCore expects the third IX Circuit at the Alta Mesa Central Processing Plant to be online in 2026. "
Heading to " 1.5 million pounds U3O8" P.A.
What's interesting is that US based U308 may have a USD$1+ premium over Canadian due to expectations of Trade war fall out. US pricing only of course.
- Forums
- ASX - By Stock
- BOE
- Ann: enCore Energy expands extraction capacity at Alta Mesa
BOE
boss energy ltd
Add to My Watchlist
3.41%
!
$3.68

Ann: enCore Energy expands extraction capacity at Alta Mesa, page-2
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$3.68 |
Change
-0.130(3.41%) |
Mkt cap ! $1.526B |
Open | High | Low | Value | Volume |
$3.83 | $3.87 | $3.64 | $16.73M | 4.516M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9998 | $3.68 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.69 | 50975 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9998 | 3.680 |
1 | 4000 | 3.670 |
4 | 4857 | 3.650 |
2 | 17828 | 3.640 |
4 | 5800 | 3.630 |
Price($) | Vol. | No. |
---|---|---|
3.690 | 19450 | 2 |
3.700 | 5000 | 1 |
3.710 | 21600 | 2 |
3.730 | 10000 | 1 |
3.740 | 30000 | 1 |
Last trade - 16.10pm 13/06/2025 (20 minute delay) ? |
Featured News
BOE (ASX) Chart |