IVZ 4.23% 7.4¢ invictus energy ltd

Ann: Encouraging Preliminary Seismic Results, page-100

  1. 3,462 Posts.
    lightbulb Created with Sketch. 793
    if you read through the Ann’s the seismic is being processed and independently interpreted. Expected time frame is and always was late January for new interpretation . There is no delay in this.

    FYI - Seismic in this case is not what will determine a duster, drilling does.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.