The 1m @ 8 g/t is interesting! Not a mine, but a good result nonetheless.
The Ramelius drilling north of Wattle Dam needs to be represented on the longitudinal projection, important to show where all holes have been drilled, even if no gold intersected. This method of only showing mineralized intercepts is borderline misleading.
Ann: Encouraging Wattle Dam phase-2 drilling results, page-2
Add to My Watchlist
What is My Watchlist?