So MUN is now building a small wall between the affected area...

  1. 24,765 Posts.
    So MUN is now building a small wall between the affected area and the dam, work which is "not expected to be major."

    How many thousands of dollars is that in unexpected costs, even though it is "not expected to be major?"

    MUN also told us that "while no specific time has been established, production is expected to be resumed in the short term. The total effect on production is not able to be made until production commences."

    What does MUN mean by "short term?" A day or two? One week. Two weeks. A Month? Longer than that? And in the meantime MUN's expenses don't go away.
 