BML 2.22% 8.8¢ boab metals limited

Ann: Engineering & Design Commences for Sorby Hills Project, page-8

  1. 33,876 Posts.
    lightbulb Created with Sketch. 1824
    GRES took 14 months from mobilisation to first material produced at G1A , and kept to their timeframe , so if they say they can do it in 8 months I am not too inclined to doubt them , really depends on how many other projects they have on the go at the time , and if machinery procurement is with reputable companies .
    However Would have thought there would have been other contract contenders other than GRES , to get the most competitive quotes .
 
watchlist Created with Sketch. Add BML (ASX) to my watchlist
(20min delay)
Last
8.8¢
Change
-0.002(2.22%)
Mkt cap ! $20.53M
Open High Low Value Volume
9.1¢ 9.1¢ 8.5¢ $10.76K 122.4K

Buyers (Bids)

No. Vol. Price($)
2 60554 8.7¢
 

Sellers (Offers)

Price($) Vol. No.
8.8¢ 94301 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
BML (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.