what would substantial extra contingencies ie (major capex blowout) do to the IRR and NPV? all for a site that may not happen. change of refinery location will need an updated DFS.
different logistics, different shipping costs. more time more planning!.
would need to find suitable government land and restart the EIS all over again!
as these issues come to Light in the near future, confidence drops resulting in the shareprice dropping meaning the larger the market cap to capex ratio becomes meaning even more significant dilution required . it's a death spiral
more red flags then a Chinese military parade in that last announcement and now PB talking about an electrolyte plant wow! I have grave concerns for this company! get out while you can is my advice
PB shame on you! you have stolen a living
- Forums
- ASX - By Stock
- Ann: Engineering firm engaged for Vanadium Electrolyte production
what would substantial extra contingencies ie (major capex...
-
-
- There are more pages in this discussion • 84 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $110.2M |
Open | High | Low | Value | Volume |
6.9¢ | 7.0¢ | 6.7¢ | $49.12K | 721.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 220052 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.8¢ | 98020 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 220052 | 0.067 |
6 | 535191 | 0.066 |
4 | 396153 | 0.065 |
4 | 262625 | 0.064 |
3 | 220000 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.068 | 98020 | 2 |
0.069 | 63100 | 2 |
0.070 | 38000 | 1 |
0.072 | 96840 | 1 |
0.073 | 25320 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |