No expert here. Just my thoughts.
the deeper the contact on this well increases the volume of the mapped triangle in the graph, lsrger volume, lsrger potential gas storage?
Initial water well drilling was stopped as water was not reached, purpose was for water. If it had of bern drilled to match the depth of the triangle on latest results gas may have been encountered to the same lower base as the well just drilled. This gives the potential for the extra gas depth you are querying.
My thoughts might be wrong so I am also interested tohear from others with greater understanding in the drilling to date.
- Forums
- ASX - By Stock
- BNL
- Ann: Enterprise 16-1 Drilling Update
Ann: Enterprise 16-1 Drilling Update, page-33
-
- There are more pages in this discussion • 98 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BNL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.001(12.5%) |
Mkt cap ! $17.48M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.8¢ | $5.699K | 655.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 4777864 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 4122024 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 4777864 | 0.008 |
27 | 8862337 | 0.007 |
19 | 8646439 | 0.006 |
22 | 7999250 | 0.005 |
5 | 5660001 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 4122024 | 9 |
0.010 | 4131967 | 11 |
0.011 | 1727728 | 4 |
0.012 | 1204565 | 4 |
0.013 | 136364 | 1 |
Last trade - 15.59pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
0.8¢ |
  |
Change
0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.8¢ | 0.8¢ | 0.8¢ | 992814 | ||
Last updated 11.42am 16/05/2024 ? |
Featured News
BNL (ASX) Chart |