Yep.
EG Jubilee Metals: glycine leaching waste - aiming to produce 20,000 tpa Cu @<$4,000/t for $50m capex, 12 months to construct and commission
· Jubilee secures one of the largest copper waste rock assets on surface in Zambia.
· Estimated at more than 350 million tonnes of waste rock material on surface. Early results from preliminary surface sampling indicate zones with grades higher than 1.5% copper ("Waste Rock Project").
· Jubilee's technical services team has commenced extensive resource definition and process technical review with the aim of completing the project implementation detail and timeline within the next 60 days.
· Processing by Jubilee's newly developed modular copper units aims to produce in excess of 20 000 tonnes per annum of copper at a cost of below US$4 000 per tonne of copper from this historical waste rock dump.
· Overall project costs including mining equipment and project infrastructure are likely to be around US$50 million.
· Jubilee has the capability to construct and commission all modular copper units within a 12-month period and aims to commence within Q1 CY2024.
- Forums
- ASX - By Stock
- EM2
- Ann: Entitlement Offer Closes Raising $4.18 million
Ann: Entitlement Offer Closes Raising $4.18 million, page-37
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EM2 (ASX) to my watchlist
|
|||||
Last
5.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $19.64M |
Open | High | Low | Value | Volume |
5.0¢ | 5.0¢ | 5.0¢ | $6.5K | 130K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 50000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 50000 | 0.050 |
1 | 68750 | 0.049 |
6 | 79126 | 0.048 |
1 | 66688 | 0.045 |
1 | 140000 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 100000 | 1 |
0.060 | 106868 | 2 |
0.061 | 34500 | 1 |
0.062 | 44550 | 1 |
0.063 | 9503 | 1 |
Last trade - 10.49am 06/08/2024 (20 minute delay) ? |
Featured News
EM2 (ASX) Chart |