I hope you are correct with your theory, but Iam expecting a blow out with costs and delays due to the tailing dam overflowing and flooding the whole site , I have also heard there was hundreds of workers doing nothing for weeks as they can’t get the steel work to site on time due to the flooding.
I hope the main contactor is paying for the delays and not us
My guess and my guess only : the reason for this halt is due to the fact the tailing ponds are incorrectly designed/cut and the environment plan has to be redesigned, if the ponds collapsed/ overflowed just due to the rain , what will happen when the ponds are full of tailings then it rains !
before I get called a downramper , I have held since the BGS days and want the best for all of us
- Forums
- ASX - By Stock
- Ann: Equity Investment Agreement Execution and Debt Drawdown
I hope you are correct with your theory, but Iam expecting a...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $498.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online