Production in the next 3 months is a little optimistic. For one, I presume that more drilling/assays will be required to better define the boundaries of the orebody and produce a detailed pit design. We know how long that can take.
Also, I doubt that there are too many mining contractors in WA right now that have staff and equipment just sitting around idle waiting for work. There could be quite a long lead time for that.
Hopefully by next week we'll have the scoping study and we'll all have a much better idea of the way forward from here.