SVL 0.00% 16.5¢ silver mines limited

Ann: Europe Corporate Presentation, page-2

  1. 889 Posts.
    lightbulb Created with Sketch. 549
    My points of note:

    - Definitive Feasibility Study to be completed early 2024
    - Development targeted for second half of 2024
    - Mine design will see tonnages increase in updated ore reserve.
    - Metallurgical program will likely see recoveries increase substantially
    - Low initial capital requirement of A$ 246 M to develop a 2 Mtpa project, producing an average of 6 Moz Ag per annum over the first 3 years of production at an average cash cost of US$ 9.15 /Oz
    - Single open-cut mine with uncomplicated mining, a low strip ratio and metallurgy with an initial mine life of 17 years. Potential expansion with open pit and underground operations.
    Last edited by Fernit: 27/06/23
 
watchlist Created with Sketch. Add SVL (ASX) to my watchlist
(20min delay)
Last
16.5¢
Change
0.000(0.00%)
Mkt cap ! $248.8M
Open High Low Value Volume
16.5¢ 17.0¢ 16.0¢ $605.2K 3.657M

Buyers (Bids)

No. Vol. Price($)
8 303479 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 352068 5
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
16.8¢
  Change
0.000 ( 0.12 %)
Open High Low Volume
16.8¢ 17.0¢ 16.3¢ 1722558
Last updated 15.52pm 14/06/2024 ?
SVL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.