My points of note:
- Definitive Feasibility Study to be completed early 2024
- Development targeted for second half of 2024
- Mine design will see tonnages increase in updated ore reserve.
- Metallurgical program will likely see recoveries increase substantially
- Low initial capital requirement of A$ 246 M to develop a 2 Mtpa project, producing an average of 6 Moz Ag per annum over the first 3 years of production at an average cash cost of US$ 9.15 /Oz
- Single open-cut mine with uncomplicated mining, a low strip ratio and metallurgy with an initial mine life of 17 years. Potential expansion with open pit and underground operations.
- Forums
- ASX - By Stock
- SVL
- Ann: Europe Corporate Presentation
Ann: Europe Corporate Presentation, page-2
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $248.8M |
Open | High | Low | Value | Volume |
16.5¢ | 17.0¢ | 16.0¢ | $605.2K | 3.657M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 303479 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 352068 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 278934 | 0.165 |
59 | 2000048 | 0.160 |
18 | 869422 | 0.155 |
22 | 2199222 | 0.150 |
6 | 746195 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 135333 | 3 |
0.175 | 619079 | 8 |
0.180 | 2275480 | 17 |
0.185 | 1732791 | 17 |
0.190 | 620462 | 9 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
16.8¢ |
  |
Change
0.000 ( 0.12 %) |
|||
Open | High | Low | Volume | ||
16.8¢ | 17.0¢ | 16.3¢ | 1722558 | ||
Last updated 15.52pm 14/06/2024 ? |
Featured News
SVL (ASX) Chart |