My points of note:
- Definitive Feasibility Study to be completed early 2024
- Development targeted for second half of 2024
- Mine design will see tonnages increase in updated ore reserve.
- Metallurgical program will likely see recoveries increase substantially
- Low initial capital requirement of A$ 246 M to develop a 2 Mtpa project, producing an average of 6 Moz Ag per annum over the first 3 years of production at an average cash cost of US$ 9.15 /Oz
- Single open-cut mine with uncomplicated mining, a low strip ratio and metallurgy with an initial mine life of 17 years. Potential expansion with open pit and underground operations.
- Forums
- ASX - By Stock
- Ann: Europe Corporate Presentation
My points of note:- Definitive Feasibility Study to be completed...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVL (ASX) to my watchlist
|
|||||
Last
17.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $256.3M |
Open | High | Low | Value | Volume |
17.5¢ | 17.5¢ | 16.5¢ | $598.7K | 3.513M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 722567 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 886260 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 666354 | 0.165 |
61 | 2272354 | 0.160 |
19 | 894403 | 0.155 |
28 | 2111881 | 0.150 |
7 | 581373 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 828681 | 7 |
0.175 | 422967 | 5 |
0.180 | 2364755 | 17 |
0.185 | 1754542 | 18 |
0.190 | 785989 | 11 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
SVL (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online