My points of note:
- Definitive Feasibility Study to be completed early 2024
- Development targeted for second half of 2024
- Mine design will see tonnages increase in updated ore reserve.
- Metallurgical program will likely see recoveries increase substantially
- Low initial capital requirement of A$ 246 M to develop a 2 Mtpa project, producing an average of 6 Moz Ag per annum over the first 3 years of production at an average cash cost of US$ 9.15 /Oz
- Single open-cut mine with uncomplicated mining, a low strip ratio and metallurgy with an initial mine life of 17 years. Potential expansion with open pit and underground operations.
- Forums
- ASX - By Stock
- Ann: Europe Corporate Presentation
My points of note:- Definitive Feasibility Study to be completed...
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.010(5.26%) |
Mkt cap ! $301.6M |
Open | High | Low | Value | Volume |
19.0¢ | 20.0¢ | 18.5¢ | $1.017M | 5.321M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 290397 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 1179004 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 273987 | 0.195 |
14 | 921902 | 0.190 |
21 | 1948889 | 0.185 |
37 | 2097187 | 0.180 |
18 | 1138213 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 1168703 | 15 |
0.205 | 648000 | 6 |
0.210 | 772580 | 7 |
0.215 | 1341499 | 14 |
0.220 | 1713499 | 33 |
Last trade - 16.10pm 24/05/2024 (20 minute delay) ? |
|
|||||
Last
20.0¢ |
  |
Change
0.010 ( 4.77 %) |
|||
Open | High | Low | Volume | ||
18.8¢ | 20.0¢ | 18.5¢ | 2957935 | ||
Last updated 15.59pm 24/05/2024 ? |
Featured News
SVL (ASX) Chart |