What do you mean Linzy? The whole process from start to finish? Are you asking about the drilling side of things or once the core has been layer into trays and handed over to GEO's?
If your referring to drilling, obviously it depends on the ground, to give you an example of hard rock HQ, it can take 6 hours to get 3 meters! That's just drilling and not extracting it. That's just an example of diamond drilling which was done at Mt Todd gold mine.
I'm not sure how deep they are drilling each hole, but it would be very easy drilling up to 50 meters I would say. I would be guessing a few hours with drilling and relocating the drill rig per hole. I have off siding experience but mainly work in Mining.
- Forums
- ASX - By Stock
- Ann: Excellent Drilling Results Expand REE Footprint at Mt Ridley
What do you mean Linzy? The whole process from start to finish?...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.784M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRD (ASX) Chart |
Day chart unavailable