Tonnes of media coverage. Made it into the Australian, Mercury, Herald Sun and others.
Seems the high 50% quartz content from the rhyolitic saprolite is the key to the excellent permeability which could get the in-situ leaching scenario across the line.
BCM’s REE heap leach test opens door to lower-cost options for Ema
Brazilian Critical Minerals’ successful column leaching has opened up lower-cost processing options for its Ema REE project in Brazil.
Special Report2 min readAugust 7, 2024 - 3:17PM*
Brazilian Critical Minerals’ successful column testing offers potential for low-capex heap leaching for its Ema project
Leaching successfully achieves 63% recovery of MREOs after only 18 days using magnesium sulphate
Company now considering in-situ leaching of Ema mineralisation
Special Report: Successful column leaching has raised the likelihood that Brazilian Critical Minerals will be able to construct a rare earths processing flow sheet that will allow development of its Ema project with fewer steps and lower risks.
Testing by the Australian Nuclear Science & Technology Organisation on a 50kg composite of 62 samples collected from 12 holes achieved 63% recovery of valuable magnet rare earth oxides (MREO) after just 18 days of heap leaching using magnesium sulphate.
Importantly for Brazilian Critical Minerals (ASX:BCM), the results provide the option for a low-capex REE heap leach operation for its Ema project in Brazil.
As such, the company is now planning to go a step further and fully explore the possibilities of in-situ leaching of Ema mineralisation, which will involve even fewer steps from mine to final product than is involved in heap leaching.
“These results are quite stunning in their simplicity, to be able to desorb the rare earths so quickly at a high rate of recovery is quite remarkable,” managing director Andrew Reid said.
“The physical and chemical characteristics of the mineralisation at Ema have now been thoroughly tested giving similar results for both slurry (tank leaching) and now heap leaching.
“These heap leach results have now validated a much lower capex path to production when compared to tank leaching. The company now intends to extend its testing regime towards in-situ leaching, where we are confident of high recoveries being achieved, with the only unknown element of clay permeability to be determined.
“Field and lab work to demonstrate the permeability of the Ema mineralisation to in-situ leaching is now being planned.
“Not only is the company heading towards a low capex and low opex project setup, but the ability to get high recoveries utilising magnesium sulfate as opposed to ammonium sulfate means the Ema project could be one of the greenest and environmentally friendliest mines ever constructed.”
Lower-cost processing
The column testing was carried out as a key part of the company’s strategy to grow and progress the current Ema resource of 1.02Bt at 793 parts per million (ppm) total rare earth oxide (TREO) towards development.
Notably, the final calculated leach liquor and residue recovery of 63% is materially in line with previously announced slurry recovery results and demonstrate clear potential to achieve lower processing costs through simpler and scalable treatment options.
Lower processing costs also make it viable to treat lower-grade material, which will help secure economies of scale.
It also gives the company confidence that in-situ leaching is possible as the clay hosting Ema mineralisation is comprised of almost 50% quartz, which could enable economic rates of fluid flow.
https://www.theaustralian.com.au/business/*/content/bcms-ree-heap-leach-test-opens-door-to-lowercost-options-for-ema/news-story/8ab3af1cb34bd0755dd6023448664fb8
https://www.themercury.com.au/business/*/low-impurities-at-ema-project-boosts-bcms-path-to-efficient-ree-production/news-story/8ae5ea66d2cdb7f5a4e65d22a84c7608
https://www.couriermail.com.au/business/*/low-impurities-at-ema-project-boosts-bcms-path-to-efficient-ree-production/news-story/8ae5ea66d2cdb7f5a4e65d22a84c7608?nk=febbfa4bc6ad877d0579bd3558b5ddd7-1723030326
https://st*ckhead.com.au/resources/bcms-ree-heap-leach-test-opens-door-to-lower-cost-options-for-ema/
- Forums
- ASX - By Stock
- BCM
- Ann: Excellent Heap Leach Recoveries Ema Project
Ann: Excellent Heap Leach Recoveries Ema Project, page-21
-
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.002(16.7%) |
Mkt cap ! $11.63M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.4¢ | $1.038K | 75.74K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 502367 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.013 |
2 | 284072 | 0.012 |
3 | 1051688 | 0.011 |
2 | 150000 | 0.010 |
1 | 100000 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 502367 | 1 |
0.016 | 130000 | 1 |
0.018 | 597632 | 1 |
0.020 | 5972 | 1 |
0.022 | 160000 | 1 |
Last trade - 14.17pm 12/09/2024 (20 minute delay) ? |
Featured News
BCM (ASX) Chart |