DKO 0.00% 5.6¢ dakota minerals limited

Ann: Excellent Phase Two Drill Results at Sepeda Lithium Project, page-59

  1. 1,082 Posts.
    lightbulb Created with Sketch. 3
    It would be nice to get an update on the metallurgical work being completed. It is due April but they must be half way through and be able to draw some conclusions by now.
 
watchlist Created with Sketch. Add DKO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.