re: Ann: Excellent Results from Ore Sorter Te... Hi Plough,
Will the plant we require cost about the same, ($US14m). I can't get my head around the fact that the retreatment of the 12mt of mineralised stockpiles will provide feed for planned production for six years.
Stumpy.
re: Ann: Excellent Results from Ore Sorter Te... Hi Plough,Will...
Add to My Watchlist
What is My Watchlist?