only a scoping study
capex is ball park ($1M per tonne)
opex is low $106/t
nothing mentioned about the same 'back end' with Kola
in other words, despite Kola (underground mining) & Dougou (solution mining) having different mining methods, the back end processing may possibly be able to use the same plant (but then maybe not)
Ann: Excellent Scoping Study Results for the Dougou Project, page-2
Add to My Watchlist
What is My Watchlist?