CRR 0.00% 0.9¢ critical resources limited

Ann: Exceptional Assay Results of up to 5.12% Li2O at Mavis Lake, page-19

  1. 218 Posts.
    lightbulb Created with Sketch. 224
    Marginal lithium project in Canada

    Good luck

    All marginal lithium projects are doomed

    The costs to get this up and running would be phenomenal

    It is simply not possible

    Imagine spending a Billion in CAPEX to build a marginal mine that would be operating at a loss

    I am sorry to say but CRR will never succeed. Your only hope is if someone buys them out for dirt cheap. But there are many better options to choose from. WR1, PMT, WC8 to name a few. Why bother buying this marginal project unless you need more ore nearby.

    The projects mentioned above will have a long mine life, there is no shortage to be wasting time with CRR
 
watchlist Created with Sketch. Add CRR (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $16.02M
Open High Low Value Volume
0.8¢ 0.9¢ 0.8¢ $2.164K 264.9K

Buyers (Bids)

No. Vol. Price($)
12 2462287 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 456053 1
View Market Depth
Last trade - 16.10pm 27/08/2024 (20 minute delay) ?
CRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.