Marginal lithium project in Canada
Good luck
All marginal lithium projects are doomed
The costs to get this up and running would be phenomenal
It is simply not possible
Imagine spending a Billion in CAPEX to build a marginal mine that would be operating at a loss
I am sorry to say but CRR will never succeed. Your only hope is if someone buys them out for dirt cheap. But there are many better options to choose from. WR1, PMT, WC8 to name a few. Why bother buying this marginal project unless you need more ore nearby.
The projects mentioned above will have a long mine life, there is no shortage to be wasting time with CRR
- Forums
- ASX - By Stock
- Ann: Exceptional Assay Results of up to 5.12% Li2O at Mavis Lake
Marginal lithium project in CanadaGood luckAll marginal lithium...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
-0.001(12.5%) |
Mkt cap ! $15.70M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.7¢ | $4.986K | 635.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 2433987 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 1578371 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 2433987 | 0.007 |
26 | 11793317 | 0.006 |
23 | 10054267 | 0.005 |
8 | 7037595 | 0.004 |
4 | 5170001 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 1578371 | 7 |
0.009 | 5169204 | 7 |
0.010 | 2198868 | 7 |
0.011 | 1552168 | 5 |
0.012 | 2948409 | 5 |
Last trade - 12.00pm 13/11/2024 (20 minute delay) ? |
Featured News
CRR (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online