ARL 1.68% 60.5¢ ardea resources limited

@florian_munich In my opinion COB have a number of problems at...

  1. 3,321 Posts.
    lightbulb Created with Sketch. 1885
    @florian_munich
    In my opinion COB have a number of problems at the moment.
    - C1 Cost of production is high and they do not have by product credits to reduce opex cost.
    - The plant build is costly considering the mine life of 12 years.​
    - The resource is too small having maximum 12 years of production from existing tenements, it would be prudent to JV or buyout AUZ Thackaranga. AUZ are adopting a wait and see attitude, perhaps opportunistically waiting.
    My opinion only DYOR
    RED
    Last edited by RED328: 10/09/18
 
watchlist Created with Sketch. Add ARL (ASX) to my watchlist
(20min delay)
Last
60.5¢
Change
0.010(1.68%)
Mkt cap ! $120.7M
Open High Low Value Volume
60.5¢ 60.5¢ 59.0¢ $24.88K 41.67K

Buyers (Bids)

No. Vol. Price($)
1 1185 59.5¢
 

Sellers (Offers)

Price($) Vol. No.
60.5¢ 17737 2
View Market Depth
Last trade - 16.10pm 30/05/2024 (20 minute delay) ?
Last
60.5¢
  Change
0.010 ( 1.68 %)
Open High Low Volume
59.5¢ 60.5¢ 59.0¢ 13444
Last updated 15.26pm 30/05/2024 ?
ARL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.