Hard to argue the potential of the resource if they can make it happen. Grade control has always been an issue in the current free milling operation and learning from that for the sulphide resource can only be a good thing.
Particularly like the comments around cost reduction for the sulphide production.
GLTA
Ann: Exceptional High-Grade Drilling Results Continue at Wiluna, page-4
Add to My Watchlist
What is My Watchlist?