DTR 0.00% 0.5¢ dateline resources limited

Ann: Exceptional Intersect of 88 metres @ 4.18g/t Au at Colosseum, page-4

  1. 132 Posts.
    lightbulb Created with Sketch. 59
    "Mineralisation at the Colosseum mine is primarily contained in two breccia pipes that are made up of a combination of sediment, felsite and granite units.

    Until recently, very high grade mineralisation was thought to occur only in the sedimentary breccia unit.

    Drill holes CM24-16 and CM24-15 have demonstrated high grade mineralisation can also occur in the felsite breccia unit.

    In addition, drill hole CM23-14 intersected mineralisation in quartz veins that are in the granite outside of the breccia pipes.

    A revised geology model will be completed when the balance of the results from CM24-16 become available."
 
watchlist Created with Sketch. Add DTR (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $11.08M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
10 5395835 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 47028 1
View Market Depth
Last trade - 16.12pm 14/08/2024 (20 minute delay) ?
DTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.