DTR 18.2% 0.9¢ dateline resources limited

"Mineralisation at the Colosseum mine is primarily contained in...

  1. 90 Posts.
    lightbulb Created with Sketch. 32
    "Mineralisation at the Colosseum mine is primarily contained in two breccia pipes that are made up of a combination of sediment, felsite and granite units.

    Until recently, very high grade mineralisation was thought to occur only in the sedimentary breccia unit.

    Drill holes CM24-16 and CM24-15 have demonstrated high grade mineralisation can also occur in the felsite breccia unit.

    In addition, drill hole CM23-14 intersected mineralisation in quartz veins that are in the granite outside of the breccia pipes.

    A revised geology model will be completed when the balance of the results from CM24-16 become available."
 
watchlist Created with Sketch. Add DTR (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.002(18.2%)
Mkt cap ! $13.07M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $16.75K 1.677M

Buyers (Bids)

No. Vol. Price($)
10 2419488 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 1031885 5
View Market Depth
Last trade - 10.22am 06/05/2024 (20 minute delay) ?
Last
1.0¢
  Change
-0.002 ( 9.09 %)
Open High Low Volume
1.0¢ 1.0¢ 0.9¢ 2979100
Last updated 11.09am 06/05/2024 ?
DTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.