If the above tabled drill hole intercepts are replicated by assay, then an early bird rough Back of Envelope resource calc can be undertaken for AP0011 & AP0012 based on data to date by extrapolation:
AP0011 800m x 55m x 300m x 2.7 = ~35Mt @ 1.00 – 1.25% Li2O
AP0012 800m x 25m x 200m x 2.7 = ~10Mt @ 1.00 – 1.25% Li2O
Totaling +45Mt conservatively in strike and width for these two spodumene bearing pegmatite zones alone, the Andover Li Project definitely has the potential to be a true Tier 1 spodumene deposit (+100Mt @ >1.25% Li2O).
Hope the above posts were not confusing and helps some in their decision making.
Either ways a no brainer for me like KDR was and LTR is. Accumulation time again, fingers crossed for that next short term rise and longer term gain. Best of endeavors and luck to all AZS shareholders … Bye …
……………………………………………………………………………………………….……
Sometimes the questions are complicated and the answers are simple.
~ Dr Seuss
- Forums
- ASX - By Stock
- AZS
- Ann: Exceptional Lithium Drill Intersections from Andover
Ann: Exceptional Lithium Drill Intersections from Andover, page-170
-
- There are more pages in this discussion • 446 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)