AZS 0.00% $3.69 azure minerals limited

If the above tabled drill hole intercepts are replicated by...

  1. 1,751 Posts.
    lightbulb Created with Sketch. 1072

    If the above tabled drill hole intercepts are replicated by assay, then an early bird rough Back of Envelope resource calc can be undertaken for AP0011 & AP0012 based on data to date by extrapolation:

    AP0011 800m x 55m x 300m x 2.7 = ~35Mt @ 1.00 – 1.25% Li2O
    AP0012 800m x 25m x 200m x 2.7 = ~10Mt @ 1.00 – 1.25% Li2O

    Totaling +45Mt conservatively in strike and width for these two spodumene bearing pegmatite zones alone, the Andover Li Project definitely has the potential to be a true Tier 1 spodumene deposit (+100Mt @ >1.25% Li2O).

    Hope the above posts were not confusing and helps some in their decision making.

    Either ways a no brainer for me like KDR was and LTR is. Accumulation time again, fingers crossed for that next short term rise and longer term gain. Best of endeavors and luck to all AZS shareholders … Bye …

    ……………………………………………………………………………………………….……
    Sometimes the questions are complicated and the answers are simple.
    ~ Dr Seuss

 
watchlist Created with Sketch. Add AZS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.