Note:
There are visual spod in coming drill cores so expect results will be consistent or higher grade...The best is yet to come CB4S
Open to North East potentially another 1km so in total over 3km...2kms already sampling potentially another over 1km in open direction. Kathleen Valley strike length only over 1km.
And... this is just AP9 11 and 12 holly molly this will be very big maybe the biggest monster
6 rigs in operation at start of July. WIll be have 100mt at 1st MRE? I am dreaming