Geeenius asked
I wonder where that extension drilling of Antler fits into the overall priority ranking for upcoming drilling? Before or after the Copper Knob and Rattlesnake Ridge?
The EM and IP surveys are coming soon too for the Roadrunner series and these will also show additional high priority targets much closer to the surface.
I'm thinking it would be better to have additional ore closer to the surface even if this is a smaller deposit as the rate of extraction could double or triple. This would supercharge the initial cash flow and could start the plant earlier.
However, if we can mine at twice the rate and also haul at twice the rate from underground then this would also work after cutting a shaft across.
- Forums
- ASX - By Stock
- Ann: Exceptional New Drill Target Defined Next to Antler Deposit
Geeenius askedI wonder where that extension drilling of Antler...
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.2¢ |
Change
-0.001(3.03%) |
Mkt cap ! $90.74M |
Open | High | Low | Value | Volume |
3.3¢ | 3.4¢ | 3.1¢ | $296.6K | 9.209M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 196671 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 302361 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 196671 | 0.032 |
3 | 465000 | 0.031 |
11 | 1281999 | 0.030 |
3 | 320698 | 0.029 |
2 | 190000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 16900 | 1 |
0.035 | 162910 | 1 |
0.036 | 1512000 | 2 |
0.037 | 19525 | 1 |
0.038 | 645000 | 2 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
3.2¢ |
  |
Change
-0.001 ( 3.03 %) |
|||
Open | High | Low | Volume | ||
3.3¢ | 3.3¢ | 3.1¢ | 5246474 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
NWC (ASX) Chart |