    I have to say that I agree.

    Ore that's marginal for cut-off now becomes part of the resource.

    I can do some simple analysis on feasibility of the production metrics required.

    So we drop the cut-off from 0.18 g/t to 0.1 g/t. That boosts the resource to 3.83 Moz.

    Screen Shot 2020-12-19 at 9.46.30 am.png

    Next I need to work out how many ore sorters they would need.

    The ore sorter processes ore at 3,600 tph.

    Screen Shot 2020-12-19 at 9.49.05 am.png

    Now let's make some other assumptions:
    • 60% of the resource converted to reserve. This is the portion of the resource they are likely to be able to define as part of a pit shell from looking at studies for other mines.
    • They have achieved 76% recovery in preliminary bottle roll heap leach test work.
    • 15 years mine life.
    • Victoria Gold used 7,140 hours / annum operating hours for equipment in their 2012 feasibility study (see below)
    Screen Shot 2020-12-19 at 9.56.33 am.png


    Those assumptions result in:
    • approximately 166 koz pa production from the mine
    • 12.5 Mt of rock needs to be processed per annum
    • 1,754 tonnes of rock are processed per available hour
    Screen Shot 2020-12-19 at 10.00.17 am.png

    1,754 tonnes per hour is comfortably within the operating parameters of the ore sorter.

    Screen Shot 2020-12-19 at 9.49.05 am.png

    Now the smart thing to do would be to only ore sort the ore at the margins of cut-off. Ore selection would be done through grade control-drilling. So they would perhaps only ore-sort less than 25% of the ore [theory is that less operating costs (power, spares, etc) for running the ore sorter].

    This is the current block model ( for the 3.3 Moz resource ).

    Screen Shot 2020-12-19 at 10.09.50 am.png
 