The issue is simple. IAC projects are not economic at spot prices. They are huge earthmoving exercises, moving 100% of the dirt to extract 0.3%, and returning 99.7% to the waste dump (which in Brazil will be a dry tailings dam built in a monsoonal climate). Meanwhile other explorers have discovered ultra high grades of REE sands and hard rock ... it might be more expensive to mine rock but at ultra high grades you move a lot less of it
- Forums
- ASX - By Stock
- Ann: Exceptional REE Drill Results Outside Inferred Resources
The issue is simple. IAC projects are not economic at spot...
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEI (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.0¢ |
Change
-0.005(2.22%) |
Mkt cap ! $437.8M |
Open | High | Low | Value | Volume |
22.5¢ | 22.8¢ | 21.5¢ | $385.6K | 1.739M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 500983 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 406489 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 495983 | 0.215 |
12 | 2286505 | 0.210 |
6 | 1121005 | 0.205 |
13 | 430850 | 0.200 |
5 | 551286 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 367618 | 5 |
0.225 | 127209 | 5 |
0.230 | 399008 | 4 |
0.235 | 349462 | 3 |
0.240 | 495287 | 7 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
21.8¢ |
  |
Change
-0.005 ( 3.46 %) |
|||
Open | High | Low | Volume | ||
22.5¢ | 22.5¢ | 21.8¢ | 548839 | ||
Last updated 15.59pm 03/05/2024 ? |
Featured News
MEI (ASX) Chart |