Not familiar with Geraldton but the norm at Bunbury:
Can get tonnage loaded either by ship survey or by integrator reading from loading conveyor.
There would be an auto sampler taking cuts as product is loaded.
The sample can be up to 150kgs from a 10kt shipment, sample is split down and a representative sample sent to an independent lab for analysis.
Moisture content and elements in lc are assayed.
dry tonnes x %ZrO2 x unit rate = $$
kcf
- Forums
- ASX - By Stock
- Ann: Existing Bondholders provide additional A$20M Loan Facility
Not familiar with Geraldton but the norm at Bunbury:Can get...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable