What a difference a little "s" makes. On the 8th of November the DD tail was on one hole TGRC0009. Now its the DD rig is deployed as required for drill hole extensions. So TG6's thinking is now that multiple DD extensions will be required. What could have happened over the last 5 days to change their thinking from one DD tail on RC09 to now having multiple DD extensions?
8 November:
Today's announcement. "for drill hole extensions"
- Forums
- ASX - By Stock
- TG6
- Ann: Expanded Lithium Soil Anomaly at Lake Johnston
Ann: Expanded Lithium Soil Anomaly at Lake Johnston, page-63
-
-
- There are more pages in this discussion • 99 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TG6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.5¢ |
Change
0.005(3.85%) |
Mkt cap ! $9.599M |
Open | High | Low | Value | Volume |
13.5¢ | 13.5¢ | 13.5¢ | $2.7K | 20K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 54194 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 40 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 54194 | 0.130 |
3 | 58332 | 0.120 |
2 | 53985 | 0.115 |
2 | 54454 | 0.110 |
4 | 87300 | 0.100 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 40 | 1 |
0.140 | 4000 | 1 |
0.150 | 40000 | 1 |
0.155 | 4500 | 1 |
0.160 | 70859 | 2 |
Last trade - 14.43pm 13/09/2024 (20 minute delay) ? |
Featured News
TG6 (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online