Kempfield Stage 3 RC Drilling Program
The gradual increase and relative stability in commodity prices for gold, silver, zinc and copper prices
since the onset of COVID-19 has led the Company to accelerate the exploration program and bring
forward our Kempfield Stage 3 RC drilling program to early 2021.
By combining historical drilling data, the current RC extension drilling program and mineralised rock
chip sample results, the Company has identified infill areas and has planned for a further Stage 3 RC
drilling program over:
• Henry Zone to Henry Zone North;
• Kempfield South to the Sugarloaf Zone;
• Kempfield West; and
• In fill between Kempfield Zone and Henry Zone
The aim of program is to increase the existing resource model by drilling up to 10,000 - 12,000 meters
of RC drilling and that could advance the project through to formal development studies.
- Forums
- ASX - By Stock
- ARD
- Ann: EXPLORATION AND DRILLING UPDATE
Ann: EXPLORATION AND DRILLING UPDATE, page-8
-
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARD (ASX) to my watchlist
|
|||||
Last
1.7¢ |
Change
-0.001(5.56%) |
Mkt cap ! $24.36M |
Open | High | Low | Value | Volume |
1.8¢ | 1.9¢ | 1.7¢ | $52.57K | 2.929M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1274880 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 1386112 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1274880 | 0.017 |
10 | 1282050 | 0.016 |
15 | 3416482 | 0.015 |
6 | 1770856 | 0.014 |
7 | 1625320 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 1247224 | 2 |
0.019 | 4055452 | 12 |
0.020 | 2105248 | 7 |
0.021 | 1899906 | 7 |
0.022 | 1327427 | 4 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
ARD (ASX) Chart |