Drill rigs would have been booked months ago for this exploration program. I assumed BCB was relying on Sumitomo $ to fund the drilling of Hillalong but looks like the company was prepared to fund it themselves, irrespective of the term sheet with the Japanese. The BOD must be very confident in what Hillalong will offer as my understanding was funds were being pushed towards getting Isaac River into production asap.
- Forums
- ASX - By Stock
- BCB
- Ann: Exploration Program Commences at Hillalong South
Ann: Exploration Program Commences at Hillalong South, page-3
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add BCB (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $35.16M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
BCB (ASX) Chart |
Day chart unavailable