ALR 0.00% 0.4¢ altair minerals limited

I believe this is the reason CHK is moving north. With the...

  1. 5,793 Posts.
    lightbulb Created with Sketch. 1105
    I believe this is the reason CHK is moving north.

    With the troubles in Belarus and now Kazakhstan, there s massive shortages of agricultural fertilizers and potash worldwide.  I mean MASSIVE. Now there's massive risk of food shortages because of this.  Check out the news.





    Cohiba Minerals

    Pyramid Lake
    Situated in Esperance, Western Australia, Pyramid Lake is Cohiba’s Gypsum Project


    Cohiba Minerals Limited holds (100%) exploration licence E74/594, which covers all of Pyramid Lake in south-western Western Australia, for a total of 11,266 hectares or 112.66 km2. Pyramid Lake is a salt-lake covering 6,632 hectares located 115 kilometres northwest of the town of Esperance on the northern limit of the agricultural area (Figure 1 – from Hydrominex).


    Figure 1: Location of Cohiba’s Pyramid Lake Exploration Licence (from Hydrominex).
    Hydrominex Geoscience Consulting completed a resource report in August 2018 in which it issued a maiden gypsum resource statement. The maiden Indicated Resource comprises 1.3 Mt at 78% gypsum (CaSO4.2H2O), including Grade 1 and Premium gypsum within the central resource area, and an Inferred Resource containing 2.6 Mt at 67% gypsum, meeting Grade 2 agricultural requirements.

    Sampling and analysis at Pyramid Lake confirmed the gypsum has concentrations of impurities Na, Cl, Pb and Cd significantly lower than the requirements for agricultural gypsum. The gypsum has 78% of material < 2 mm, with >80% of gypsum in this sub-2 mm size range in the higher Grade 1 and Premium gypsum material. The Pyramid Lake deposit has the potential to produce significant volumes of Grade 2 (> 67% CaSO4.2H2O) material with areas of Grade 1 (>80.6% CaSO4.2H2O) and Premium (>90% CaSO4.2H2O) material.

    Cohiba has engaged consultants to produce a Mining Operations Plan (MOP), a Mining Lease (ML) application and a Mine Closure Plan as part of the company’s strategy to commence processing operations on site with sales of product into the WA agricultural sector.

    Last edited by dannyleb: 08/01/22
 
watchlist Created with Sketch. Add ALR (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $17.18M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $6.14K 1.535M

Buyers (Bids)

No. Vol. Price($)
17 38517003 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 4267221 3
View Market Depth
Last trade - 10.13am 14/06/2024 (20 minute delay) ?
ALR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.