NHE 1.79% 5.5¢ noble helium limited

What we need is a drill rig on site immediately.There has been a...

  1. 2,321 Posts.
    lightbulb Created with Sketch. 611
    What we need is a drill rig on site immediately.
    There has been a full wet season to organise contracts.
    If the teams from the UNI and bgp can get on site with equipment, then surely the rig can't be far behind.
    These teams have been on site for above a week, which means that they should already have approx 2 sites ready. With Mbelele 1 being already noted as the first. target, this means that 3 holes should be ready to drill by now.
    The pace and time lapse of the geophysics should roughly be the same as short hole drilling, therefore, a drilling programme should be able to run concurrently with the work already established, and whilst full results may take a little bit longer, I would expect the first results within 2-3 weeks otherwise I will be disappointed.

    I refuse to accept "rig contracts progressing" as an excuse
    .

 
watchlist Created with Sketch. Add NHE (ASX) to my watchlist
(20min delay)
Last
5.5¢
Change
-0.001(1.79%)
Mkt cap ! $26.11M
Open High Low Value Volume
5.7¢ 5.7¢ 5.5¢ $10.83K 196.2K

Buyers (Bids)

No. Vol. Price($)
1 50000 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 23955 1
View Market Depth
Last trade - 15.04pm 18/09/2024 (20 minute delay) ?
NHE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.