600sq km /1000rock chips-=one every 600sqmetres/ with no pictures of any hints to drill into
the 10 potential world class 58 pegamites,from the targeted 2400 rock chips and the 280 rock chips already in lab 4`6 weeks due results from19 June is any day soon.
So we are 1400 rock chips missing.
Pictures of 7 fertile spodumene suite crystals missing.
Pictures of the 10 highly prospective frill targets.
- Forums
- ASX - By Stock
- OM1
- Ann: Exploration Update - Lac des Montagnes Project
Ann: Exploration Update - Lac des Montagnes Project, page-64
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OM1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.550M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
OM1 (ASX) Chart |
Day chart unavailable