The access road has also taken further south than Target D. Its now east of RC26/RC37 (283841 / 6400736).
With the road being about 2.5km east of RC26, the right hand end is about 50m from where the dark blue (low reading) soil is on the right hand side of the map below.
Given the locations of Targets A-E, the road's gone a little further south than I expected. The 3 main candidates as to why appear to be:
#1 Its just a road and while the equipment was they are getting the full length installed to enable Jaegermeister access
#2 The spiral to the SW is soil TGSS03061 at 267ppm Li2O. Perhaps they plan at some stage to put a drill hole on this target (it was afterall the highest of all the soil results from 13 Nov 2023)
#3 Something has come up in the seismic indicating a drill hole near the southern end of the seismic string is a good idea so they need rig access to that area.
- Forums
- ASX - By Stock
- Ann: Exploration Update - Lake Johnston Lithium Project
The access road has also taken further south than Target D. Its...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TG6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.5¢ |
Change
-0.005(2.50%) |
Mkt cap ! $13.86M |
Open | High | Low | Value | Volume |
19.5¢ | 20.0¢ | 19.0¢ | $48.10K | 245.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 46249 | 19.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.5¢ | 39106 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 46249 | 0.190 |
4 | 170512 | 0.185 |
3 | 153875 | 0.180 |
1 | 28571 | 0.175 |
1 | 5882 | 0.170 |
Price($) | Vol. | No. |
---|---|---|
0.195 | 36030 | 1 |
0.200 | 103568 | 3 |
0.205 | 75000 | 1 |
0.210 | 85000 | 1 |
0.215 | 75000 | 1 |
Last trade - 15.35pm 26/06/2024 (20 minute delay) ? |
Featured News
TG6 (ASX) Chart |