AMD 0.00% 0.3¢ arrow minerals ltd

Ann: Exploration Update - Plumridge Nickel Project, page-2

  1. 2,102 Posts.
    The results of the drilling were very positive, in particular at the E1 Target where mafic rocks with a
    favourable litho-geochemical signature (including low TiO2 and Zr) were intersected in drill hole PRC003
    (Figure 3). The intersection of the mafic lithologies has confirmed the validity of recently acquired
    gravity data to target for prospective nickel-copper bearing lithologies within the Fraser Range. Samples
    from PRC003 are currently being assayed and a petrographic analysis completed.
 
watchlist Created with Sketch. Add AMD (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $31.61M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $103.6K 34.53M

Buyers (Bids)

No. Vol. Price($)
124 249894531 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 13192885 5
View Market Depth
Last trade - 16.10pm 02/08/2024 (20 minute delay) ?
AMD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.