Two things for me:
After the first hole was drilled there was this statement :
"Subsequent to completion of initial drill-testing of pipes 1 and 3 at Plato and the Guida target (see appendix), a follow-up programme will be designed around hole JED-001."
In the latest announcement there was this statement:
"Following the completion of JED-006 at Guida (figure 2) a re-assessment of results to date will be conducted in order to prioritise targets for ongoing testing. A variety of potential target styles remain to be tested, including zones of high chargeability IP anomalism with no associated magnetic response."
When I see this difference I immediately think that there is poor results from hole 1 and they will now need to look at other options to test. Although I could just be paranoid.
Also the second pipe originally had 3 holes planned but in the latest announcement one of the holes was moved to the vein section, to me again I see this as them finding nothing in the second pipe.
I don't think there is anything dodgy going on as they are in suspension and why would they be in suspension if they wanted to make a buck out of dodgyness?
The one thing I cannot fathom though is why so much drama around hole 1 if its crap? why go reassay? why send to multiple labs? who would bother with this if it was just rock? I suppose we just have to wait and see.
Unfortunately for me I see a repeat of my 2013 XMAS period when I had a significant (for me) amount invested in NEN. what a great xmas and ny that was for me..... very similar announcements etc which turned out to be nothing.
- Forums
- ASX - By Stock
- Ann: Exploration Update
Two things for me: After the first hole was drilled there was...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCM (ASX) to my watchlist
|
|||||
Last
1.4¢ |
Change
0.001(7.69%) |
Mkt cap ! $10.79M |
Open | High | Low | Value | Volume |
1.4¢ | 1.5¢ | 1.3¢ | $7.775K | 544.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 124961 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.014 |
1 | 198094 | 0.013 |
3 | 425855 | 0.012 |
1 | 200000 | 0.011 |
1 | 800000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 124961 | 1 |
0.016 | 1098955 | 3 |
0.018 | 521632 | 1 |
0.019 | 750000 | 1 |
0.020 | 5972 | 1 |
Last trade - 12.02pm 06/08/2024 (20 minute delay) ? |
Featured News
BCM (ASX) Chart |