MTC metalstech limited

Ann: EXTENSION OF HIGH GRADE MINERALISATION AT STUREC GOLD MINE, page-12

  1. 2,999 Posts.
    lightbulb Created with Sketch. 974
    Hi @SimpleJim ....
    to your questions and concerns...
    Out of last annual report:
    Screen Shot 2020-11-23 at 13.34.00.png
    It looks like by the past mining licences for Kremnica (Sturac licence), that they always got only permitted for max 3 years with Extensions periods. After the existing licence till 2024 , MTC have to apply for another extension period. Screen Shot 2020-11-23 at 13.35.00.png
    We got our underground permits till 2024...another 4 years. For me it looks like management are looking into early production from Sturec or stockpiling high grade material, what could happen with not to much capital expenditures in the near future Screen Shot 2020-11-23 at 13.55.30.png Screen Shot 2020-11-23 at 13.36.51.png
    Looking at the Sturec mineral resource model and where we are drilling atm (never drilled before)....
    looking very yummy..... Screen Shot 2020-11-23 at 13.29.41.png Hole UG 1 and UG 2 weren't to shabby as well....
    Screen Shot 2020-11-23 at 13.25.06.png
    Thats to your concerns @SimpleJim ....Even only a smaller resource, even I doubt that, would be very profitable through very low cost production through existing infrastructure, the likes of power, water and already existing underground shafts. Plus, we got some juicy never drilled before targets in close distance....

    Screen Shot 2020-11-23 at 14.17.53.png
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
14.0¢
Change
-0.005(3.45%)
Mkt cap ! $29.22M
Open High Low Value Volume
14.0¢ 14.0¢ 13.0¢ $13.34K 101.5K

Buyers (Bids)

No. Vol. Price($)
2 55769 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 8840 1
View Market Depth
Last trade - 16.10pm 23/06/2025 (20 minute delay) ?
MTC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.