Stop the press. I mixed up depths. As predicted last week, hole 4 depth would be 800m, not 900m and Hole 5 700m, not 800m. Hole 3 should be 900m.
so the Hole #4 is almost done, likely finished/ hitting basement on Monday !!!!! Corrected post below:
Drilling slowed down compared to previous pace. I guess pressure is huge and sand/gravel more compacted.
So far:
Hole #4: so far at 787m depth. ~630m of Li-rich brine already. It has another 10-20m to reach basement. At current pace (12m/d) 1-2 more days. Might be done on Monday!!!
Hole #5: so far at 650m depth. ~460m on Li-rich brine already. It has another 60m to reach basement. At current pace (7m/d) in 9 more days.
I would therefore wait to hit basement for sure, if rigs keep spinning. Monday might be another big day.
- Forums
- ASX - By Stock
- Ann: Extension of Massive Intersections of Brine at Solaroz
Stop the press. I mixed up depths. As predicted last week, hole...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
37.0¢ |
Change
-0.005(1.33%) |
Mkt cap ! $41.44M |
Open | High | Low | Value | Volume |
37.5¢ | 37.5¢ | 37.0¢ | $11.81K | 31.94K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 42185 | 37.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
38.0¢ | 10374 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 42185 | 0.370 |
3 | 47739 | 0.365 |
2 | 105547 | 0.360 |
1 | 50000 | 0.355 |
4 | 14510 | 0.350 |
Price($) | Vol. | No. |
---|---|---|
0.380 | 10374 | 2 |
0.390 | 4780 | 1 |
0.395 | 331466 | 1 |
0.400 | 80520 | 3 |
0.410 | 5421 | 1 |
Last trade - 14.17pm 05/07/2024 (20 minute delay) ? |
Featured News
LEL (ASX) Chart |