Stop the press. I mixed up depths. As predicted last week, hole 4 depth would be 800m, not 900m and Hole 5 700m, not 800m. Hole 3 should be 900m.
so the Hole #4 is almost done, likely finished/ hitting basement on Monday !!!!! Corrected post below:
Drilling slowed down compared to previous pace. I guess pressure is huge and sand/gravel more compacted.
So far:
Hole #4: so far at 787m depth. ~630m of Li-rich brine already. It has another 10-20m to reach basement. At current pace (12m/d) 1-2 more days. Might be done on Monday!!!
Hole #5: so far at 650m depth. ~460m on Li-rich brine already. It has another 60m to reach basement. At current pace (7m/d) in 9 more days.
I would therefore wait to hit basement for sure, if rigs keep spinning. Monday might be another big day.
- Forums
- ASX - By Stock
- Ann: Extension of Massive Intersections of Brine at Solaroz
Stop the press. I mixed up depths. As predicted last week, hole...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEL (ASX) to my watchlist
|
|||||
Last
38.0¢ |
Change
-0.025(6.17%) |
Mkt cap ! $42.56M |
Open | High | Low | Value | Volume |
40.5¢ | 40.5¢ | 37.5¢ | $60.04K | 156.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 27100 | 38.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
39.5¢ | 28228 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 27100 | 0.380 |
2 | 26400 | 0.370 |
1 | 13408 | 0.365 |
1 | 50000 | 0.360 |
1 | 10000 | 0.350 |
Price($) | Vol. | No. |
---|---|---|
0.395 | 28228 | 1 |
0.415 | 6480 | 2 |
0.430 | 3345 | 2 |
0.435 | 4000 | 1 |
0.450 | 31830 | 2 |
Last trade - 15.42pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
38.0¢ |
  |
Change
-0.025 ( 7.32 %) |
|||
Open | High | Low | Volume | ||
38.0¢ | 38.5¢ | 38.0¢ | 29628 | ||
Last updated 15.42pm 14/06/2024 ? |
Featured News
LEL (ASX) Chart |