It is interesting to note that the .005 cent fall on low vol in sp that followed was blamed upon that infamous call and put up as proof the HC posts effect sp.
Thus I would like someone to point out the HC post that caused the 1 cent on higher vol rise in sp last week.
Can't have it both ways.
I won't discuss any take on the matter....bias is bias.
- Forums
- ASX - By Stock
- Ann: Extension of Time to Hold AGM
It is interesting to note that the .005 cent fall on low vol in...
-
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVB (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online