I look at the ASIC relief (should be 2020/1080, not 2020/451) which allows listed entities take one month extension to file the reports, but entities still need to file the unaudited report before 26 Feb 21. PET should provide this report today.
- Forums
- ASX - By Stock
- Ann: Extension of time to lodge full year accounts
I look at the ASIC relief (should be 2020/1080, not 2020/451)...
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PET (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.60M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PET (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non-Executive Director
Simon Kidston
Non-Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online