Word is out in the AFR
Way back last year I did make the point that although the NPV wasn't updated for the new mine plan, opex costs were little changed (though some) from the 2019 DFS days. All predictions of robust margins hung on the veracity of opex guidance once the plant was up and running... now it is, cold reality was always going to shove misleading BS aside.
GLTAH
- Forums
- ASX - By Stock
- G1A
- Ann: Extension of Voluntary Suspension
Ann: Extension of Voluntary Suspension, page-3
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online