I can't see how it can possibly work at this silver price, even with the previous opex estimate. By my rough calculation it needs somewhere in the vicinity of $20-25 to pay off its capital costs.
But let's wait and see what the feasibility study comes up with. If they're currently saying early 2018 then expect it sometime around mid-year!
G&A costs are high because they've got about 30 people on site from all the resource drilling they did. I don't mind drilling for resource extensions, particularly chasing a porphyry, but my personal irritant is the large amount of money spent basically re-drilling the same deposit for minimal increase in silver. The only real increase in AgEq was due to changing the constants in the AgEq calculation due to changed metal prices. It's a lot of money spent to basically just confirm the previous companies' geological modelling work.
- Forums
- ASX - By Stock
- SVL
- Ann: Extensive Base Metal System Beneath Bowdens Silver Deposit
Ann: Extensive Base Metal System Beneath Bowdens Silver Deposit, page-11
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $141.7M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 272393 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.3¢ | 3695 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 192393 | 0.105 |
3 | 335514 | 0.100 |
2 | 500000 | 0.099 |
3 | 135008 | 0.098 |
4 | 371701 | 0.097 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 3695 | 1 |
0.094 | 8511 | 1 |
0.095 | 114449 | 3 |
0.096 | 162375 | 5 |
0.097 | 9616 | 1 |
Last trade - 09.58am 13/09/2024 (20 minute delay) ? |
Featured News
SVL (ASX) Chart |
Day chart unavailable