I think the delay is also due to our cash balance and the current U spot price still not being above $70. A DFS is very costly to produce. I'm sure JB will want to raise $$ at a higher SP before they commence the study.
I also think there has been some surprises with Mulga Rock with regards to the strip ratios. JB has mentioned even though the grade is better than Tumas the economics will work out similar. I'm sure CAPEX and OPEX will be higher than expected so he'll want $70/75+ before he hits the go button. As outlined today there is no certainties that the critical minerals will be feasible to mine.
- Forums
- ASX - By Stock
- DYL
- Ann: Extensive Drill Program Completed at Mulga Rock Project
Ann: Extensive Drill Program Completed at Mulga Rock Project, page-6
-
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DYL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.22 |
Change
0.080(7.02%) |
Mkt cap ! $1.105B |
Open | High | Low | Value | Volume |
$1.21 | $1.26 | $1.21 | $2.418M | 1.973M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 8093 | $1.22 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.22 | 10681 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 26105 | 1.140 |
1 | 3750 | 1.135 |
2 | 30700 | 1.130 |
2 | 102000 | 1.120 |
1 | 5000 | 1.115 |
Price($) | Vol. | No. |
---|---|---|
1.155 | 16001 | 1 |
1.165 | 21500 | 1 |
1.170 | 750 | 1 |
1.190 | 31967 | 2 |
1.195 | 80211 | 3 |
Last trade - 10.35am 18/11/2024 (20 minute delay) ? |
Featured News
DYL (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online