AYT 0.00% 0.5¢ austin metals limited

Has the program been completed yet and, if so, when are the...

  1. 755 Posts.
    lightbulb Created with Sketch. 107
    Has the program been completed yet and, if so, when are the assays due? 3 months and counting with no update whatsoever. The annual report just states the following:

    Austin Project (WA): New Aircore Drill Program Mobilised
    Subsequent to 30 June 2022 and as announced on 6 July 2022, Austin metals has commenced further aircore drilling to
    test gravity targets at the Austin Gold Project. (Figure 8).

    The drill program aims to follow up gold discovered from previous aircore drilling including at the Everlong, Overdrive and
    Generator prospects as well as several other untested gravity anomalies (Figure 8). The results of this program to date
    have been highly encouraging with the identification of extensive quartz veining at Everlong and Overdrive (Figure 9). The
    current aircore program will comprise circa 7,000m and will be the most extensive undertaken by the Company in testing
    the gravity targets that are known to host high grade gold in the district.

 
watchlist Created with Sketch. Add AYT (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $6.621M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $15K 3M

Buyers (Bids)

No. Vol. Price($)
11 11590444 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 425270 1
View Market Depth
Last trade - 09.59am 21/06/2024 (20 minute delay) ?
AYT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.